ENGINEERING

  • preliminary and final design
  • structural calculation
  • Reliefs and paths
  • Project Financing
  • Technical-Economic Studies
  • Traffic studies
  • Feasibility studies
  • Territorial Planning
  • GIS
  • quality control
  • Compute
  • Price Analysis Support
  • During construction technique
  • Construction Management
  • Accounting
  • Testing
  • Safety plans
  • Consulting

ENVIRONMENT

  • Noise impact assessment
  • Environmental impact study
  • Study of environmental rehabilitation of pits and dumps
  • Design and implementation of treatment and recovery plants
  • Preliminary study and procedure for waste disposal
  • study of ecological materials and regeneration

PAVING AND SUPERSTRUCTURE

  • sizing calculation and check of road and airport railway superstructures
  • Special high performance flooring
  • in situ regeneration of road surfaces

DEMOLITION

  • Special demolitions
  • idrodemolizioni

SPECIAL WORKS UNDERGROUND

  • Construction and consolidation of tunnels
  • mechanized (TBM)
  • Underpinning and land consolidation:
  • micropiles
  • tie rods
  • Jet-grouting
  • drain

GEOTECHNICAL DESIGN

  • monitors
  • laboratory and in situ
  • convergence excavation faces galleries
  • strain reliefs
  • inclinometer and piezometric surveys
  • landslides and groundwater monitoring
  • vibration and noise monitors

Linked images: